The Platform was located in the Dutch North Sea. Due to reservoir depletion, production was shut down and the gas processing facilities were removed. Most wells were drilled in the period from 1981 to 1989 with well depths ranging from 1740 to 4300 m. The objective was to Plug & Abandon (P&A) 11 wells and to cut casings and conductors at 6 m below the sea-floor.