The platform was located on an Oil Producing Field in the Mediterranean off the coast of Sicily.
The wells were completed in the mid 1980´s to produce heavy 15.5 API oil
Over the course of thirty years the integrity of these wells had suffered, thus a workover campaign utilising HWO was initiated
The platform previously had a drilling derrick, so lent itself to HWO very well.
To recover the old completion, test integrity of 9-5/8” casing, dependant on 9-5/8” Integrity then run 7-5/8” Casing to surface before re-completing the well.
This shall concentrate on one of the Wells