History
• 1999 Balance Point Control founded
• 2000 Approval Dutch & German mining authorities
• 2001 Introduction of the Space Saver Unit
• 2002 Business Management System VCA certified/ SCC**
• 2004 ISO 9001 : 2000 certified
• 2006 ISO 14001 certified
• 2007 BPC became a part of Superior Energy Services Inc.
• 2008 BPC acquired Meiko GmbH
• 2009 Introduction HWT 600 Unit
• 2010 OHSAS 18001 Certification
• 2011 Implemented maintenance management system
• 2012 Introduction of CSU 160k
• 2013 Introduction of live well connector
• 2014 Data acquisition system update 340k
• 2015 Introduction electric power pack for HWU units.
• 2016 Efficiency update Pipe Puller unit